REQUIREMENTS FOR BUILDING PERMIT APPLICATION

  Jobe Inspection Service, LLC

Certified Building Inspectors

P.O. Box 432 Delmont, Pa. 15626

      (724) 468-6026 / Fax (724) 468-3897__

 

REQUIREMENTS FOR BUILDING PERMIT APPLICATION

 

  1. Two (2) sets of building plans with the following requirements included:

 

   (a)    Floor plans of each level of construction

            Measurements including scale shall be indicated on drawings.

    (b)   Elevations of all exterior views, including exterior materials to be      `         used in construction.

          (c)   Wall section of typical wall (at scale larger than plans)

          (d)   Plumbing, HVAC & Electrical plans

The following information shall also be included on all drawings:

      Footer size

      Height and thickness of all foundation walls

      Framing of each floor- span, direction and member sizes

      Framing of roof          – span, direction and member sizes

      Lintel and header sizes of all doors and windows

  1. One (1) Plot Plan showing the following:

                        Front, side and rear yard setbacks

Dimensions of lot

All Easements and Right-of-Ways

Registered Surveyors Seal

  1. Completed Building Permit Application

 

  1. Completed Zoning Certification ( If Applicable)

 

  1. Copy of Sewage Tap-In or On-Lot Sewage Permit

 

  1. Copy of Energy Compliance Code the building is to be constructed to.

 

For your convenience please see web site below, this may be helpful in      completing the Energy Compliance portion of the code. 

www.energycodes.gov          (RESCHECK/COMCHECK)

Definition

 

MANUFACTURED HOME: Manufactured home means a structure, transportable in one or more sections, which in the traveling mode is 8 body feet (2438 body mm) or more in width or 40 body feet (12 192 body mm) or more in length, or, when erected on site, is 320 square feet (30m2) or more, and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities, and includes the plumbing, heating, air conditioning and electrical systems contained therein; except that such term shall include any structure that meets all the requirements of this paragraph except the size requirements and with respect to which the manufacturer voluntarily files a certification required by the secretary (HUD) and complies with the standards established under this title. For mobile homes built prior to June 15, 1976, a label certifying compliance to the Standard for Mobile Homes, NFPA501, in effect at the time of manufacture is required. For the purpose of these provisions, a mobile home shall be considered a manufactured home.

 

 

 

REQUIREMENTS FOR BUILDING PERMIT APPLICATION

  1. DAPIA (Design Approved Primary Inspection Agency) approved installation manual. (Applies to new home only)

 

  1. Footer and Foundation drawings if applicable.

 

  1. Pier Construction, provide Pier detail and Pier lay out.

 

  1. One (1) Plot Plan showing the following:

                        Front, side and rear yard setbacks

Dimensions of lot

All Easements and Right-of-Ways

Registered Surveyors Seal

  1. Completed Building Permit Application

 

  1. Completed Zoning Certification ( If Applicable)

 

  1. Copy of Sewage Tap-In or On-Lot Sewage Permit